Main content

Applications

Restroom applications

From existing washroom retrofits to independent facilities in parks and campsites, product choice depends on how and where the restroom will be used.

Restroom applicationsConcept rendering
Core applications
6
Product lines
3
Exterior finishes
Custom

Products for different settings

Six applications cover daily use, product choices and installation planning.

Municipal Public SpacesConcept rendering

Parks, streets and public squares

Municipal Public Spaces

Single modules and custom restrooms for parks, squares and public paths, with cleaning after use and equipment status available remotely.

After each use
Automatic cleaning
One dashboard
Multi-site status
Custom finishes
Exterior options
Urban parksCivic plazasWaterfront pathsTransit stopsPublic facilities

Placement

Park entrances, public squares and walking routes where people can find and reach the facilities easily.

Operation

Staff can check cleaning progress and fault alerts across locations before arranging site visits.

Single modules and custom restrooms
Automatic cleaning after use
Remote equipment monitoring
Details
Tourism and AttractionsConcept rendering

Visitor centres, trails and scenic sites

Tourism and Attractions

Single modules and custom multi-cubicle restrooms for visitor destinations. Tank, solar and battery options can be assessed where utility connections are limited.

Tank option
Water supply
Solar and battery
Power options
Prefabricated
Construction
Scenic lookoutsBeach entrancesTrailheadsTheme parksVisitor centres

Placement

Near parking, trailheads, viewpoints and food areas, with walking distances considered along the route.

Operation

Remote water, power and cleaning status helps staff plan replenishment, inspections and repairs.

Single modules and custom restrooms
Tank, solar and battery options
Custom exterior colours and finishes
Details
Commercial and Public BuildingsConcept rendering

Shops, offices, healthcare and transport

Commercial and Public Buildings

Integrated smart cubicles replace existing cubicle interiors. Complete indoor modules add new facilities where space and connections are available.

Integrated retrofit
Existing cubicles
Complete module
Additional facilities
After each use
Automatic cleaning
Mall atriumsOffice towersHospital waiting areasTransit concoursesPremium clubs

Placement

Existing restrooms or suitable new areas inside shopping centres, offices, hospitals and transport buildings.

Operation

Automatic cleaning works alongside staff inspections, with occupancy, cleaning and fault information available remotely.

Integrated cubicle retrofits
Complete indoor modules
Cleaning and equipment monitoring
Details
Events and SportsConcept rendering

Festivals, sports events and temporary venues

Events and Sports

Custom outdoor restrooms provide capacity for event crowds, while PS-C1 adds individual facilities in separate areas. Units can be relocated after the event.

By project
Cubicle count
Relocatable
After the event
Approx. 2 months
Estimated dispatch
Music festivalsSports eventsOutdoor exhibitionsFan zonesSeasonal markets

Placement

Near entrances, food areas and spectator zones, with room for queues and service access.

Operation

Staff monitor equipment and replenish supplies during the event, then prepare units for their next location.

Custom cubicle capacity
Additional single modules
Reuse at other venues
Details
Camping and Outdoor StaysConcept rendering

Tent pitches, caravan parks and holiday cabins

Camping and Outdoor Stays

Complete outdoor modules can be placed near accommodation areas, with automatic cleaning, remote monitoring and utility options suited to the site.

After each use
Automatic cleaning
Custom finishes
Exterior options
Off-grid options
Water and power
Glamping sitesRV parksForest campsLakefront cabinsOutdoor resorts

Placement

Near accommodation, shared kitchens and main paths, balancing convenience with quiet at night.

Operation

Equipment alerts help staff identify where attention is needed. Inspections and deep cleaning remain scheduled tasks.

Complete outdoor modules
Custom enclosure colours and finishes
Tank, solar and battery options
Details
Construction SitesConcept rendering

Work areas and site accommodation

Construction Sites

Outdoor modules can move with the construction programme. Custom facilities serve larger groups, while PS-C1 provides individual cubicles near separate work areas.

Relocatable
Future use
After each use
Routine cleaning
Remote access
Equipment status
Worker campsRest areasSite entrancesRemote work areasLogistics yards

Placement

Near accommodation, rest areas and work zones, with locations reviewed as roads and construction areas change.

Operation

Facility layout follows workforce numbers and project phases. Maintenance teams can review equipment condition remotely.

Custom multi-cubicle facilities
Single modules near work areas
Equipment monitoring and fault alerts
Details

Installation and maintenance

Space, utilities and expected use help establish an initial proposal. Details that are not yet known can be worked through with the team.

1

Expected use

Typical attendance and the busiest periods are considered separately, rather than sizing facilities only for average use.

2

Available space

Dimensions, access and surrounding buildings affect the product choice, alongside lighting and equipment noise.

3

Water and power

Existing connections and any tank, solar or battery requirements affect installation and ongoing servicing.

4

Routine maintenance

Cleaning, restocking, inspections and repairs need assigned staff, with travel routes planned for dispersed locations.

Product information

Content reviewed: September 5, 2026

This is an application guide. The final configuration depends on the site, local requirements and maintenance arrangements.